AI risk assessment software: site-specific RAMS in minutes, not evenings.
Describe the job and AI drafts the risk assessment and method statement from your own hazard library, scored on your matrix. Your team checks it, signs it, and gets a PDF with your logo on it. Set up for businesses anywhere in the UK.

The same document, rewritten for every job
Most contractors keep a folder of old risk assessments and copy the nearest one. It’s slow, it’s easy to miss the hazard that makes this job different, and nobody’s quite sure which version the team actually read.
- Evenings spent adapting last month’s risk assessment for tomorrow’s job
- Site-specific hazards missed because the template didn’t mention them
- Scores that mean different things depending on who wrote them
- No record of who has read and signed which version
- Documents that look different every time a client or principal contractor asks for them
Your builder, set up around how you work
AI drafts from the job
Describe the task, site and team in a sentence or two. AI drafts the hazards, who’s at risk and the controls — and flags anything it added that isn’t in your usual template.
Your hazard library
We load your existing risk assessments and templates, so drafts use your wording, your controls and your standards.
Your risk matrix
Every hazard scored before and after controls on your own likelihood × severity matrix, so scores mean the same thing every time.
Nothing issued unchecked
A competent person reviews and approves every assessment before it can be issued. AI drafts; people decide.
Branded PDFs
Every assessment exports as a PDF with your logo, reference number and revision — ready to send to a client or principal contractor.
Read & sign
Send it to the team, see who has signed which version, and chase the rest. Revisions keep their history.
Site-specific risk assessments for every kind of job
The builder learns from your own hazard library, so it drafts for the work you actually do. A few examples of what it picks up from a one-line job description:
Roofing & scaffolding
Work at height, fragile roofs and rooflights, falling materials, edge protection, weather and exclusion zones below.
Electrical
Live working and isolation, lock-off procedures, testing, working in occupied buildings and access equipment.
Groundworks & civils
Excavations, buried services, plant and vehicle movements, lifting operations, dust, noise and vibration.
Plumbing & heating
Hot works, gas safety, confined spaces, legionella, manual handling and working in customers’ homes.
Maintenance & facilities
Lone working, callouts, occupied sites, ladders and steps, cleaning chemicals with links to COSHH.
Engineering & workshops
Machinery guarding, lifting gear, welding fumes, hand-arm vibration, PPE and housekeeping.
Risk assessments that meet the standard, not just the template
The Management of Health and Safety at Work Regulations 1999 require every employer to make a suitable and sufficient assessment of the risks to their staff and anyone else affected by the work. The builder is set up around the HSE’s five steps, so every assessment covers them the same way.
It drafts. A competent person in your business still checks, edits and approves every assessment before it can be issued.
- Identify the hazards for this job and this site, not just the ones in last month’s template
- Decide who might be harmed and how: operatives, other trades, the public, residents
- Evaluate the risks before and after controls, scored on your own likelihood × severity matrix
- Record the findings in a branded PDF with a reference, revision and the method statement alongside
- Review and update with review dates tracked, revisions kept and a record of who has read and signed each version
Set up once, then use it every job
- 1
Free chat
We look at the work you do and how you write risk assessments today.
- 2
Send your templates
Share your existing risk assessments, method statements and matrix. We turn them into your hazard library.
- 3
Go live
Your builder goes live with your branding and named logins for the people who write and sign assessments.
- 4
Use it every job
Describe the job, review the AI draft, approve it, send it for signatures and download the PDF.
Just risk assessments, or the whole H&S and HR system?
Encompass One
Risk assessments, RAMS and COSHH alongside incidents, inspections, training and HR — a full platform for teams who want everything in one place.
Visit encompassone.co.ukServiceAI agents & automation
How we use AI across the rest of the admin — reading documents, matching receipts and drafting reports.
Explore the serviceFrequently asked questions
Can AI really write a risk assessment?
It writes a strong first draft from your own hazard library and the job details, and flags anything unusual. A competent person always reviews, edits and approves it before it’s issued — the builder won’t let an unapproved draft go out.
Will it use our existing templates?
Yes. Setup includes loading your current risk assessments, method statements and matrix, so drafts read like yours rather than generic ones.
How is this different from Encompass One?
The builder is just risk assessments, set up as your own branded tool around your templates. Encompass One is our full Health & Safety and HR platform, with risk assessments alongside COSHH, incidents, inspections, training and staff records.
What’s included once it’s running?
Hosting, the AI that drafts your assessments, updates and support.
Does it do method statements and RAMS too?
Yes. The builder is designed around risk assessments and site-specific RAMS, with the method statement drafted alongside the risk assessment from the same job details. Tell us what you produce today and we’ll confirm the format on the free call.
What makes a risk assessment site-specific?
It deals with the hazards of this job at this location: the access, the people nearby, the services, the weather, the plant and the materials. The builder drafts from your description of the actual job, then flags any hazard it added that your standard template doesn’t cover.
Is an AI-drafted risk assessment legally acceptable?
The law cares that the assessment is suitable and sufficient and that it’s done by a competent person, not how the first draft was typed. The AI produces a draft from your own library; a competent person in your business reviews, edits and approves it, and the builder records who approved which version.
Do you only work with businesses near Durham?
No. We’re based in Durham and set up the builder for businesses anywhere in the UK. Setup is done over video calls and email.
Get your own Risk Assessment Builder.
Tell us what kind of work you do and how you write risk assessments today. We’ll confirm it’s a fit and what we need from you. We reply within one working day.